Principia School

This project came about because the school’s main steam boiler reached lifecycle and an opportunity was available to reduce the 293,270 square foot facility’s heating costs. An oversized steam boiler was replaced with modular condensing hot water boilers that run at higher efficiency under partial load conditions. A 33% gas use reduction was achieved with a payback period of 9 years.